Typical price per square metre
For the resin bound surface itself, laid onto a sound existing base, most Shrewsbury homeowners can expect to pay somewhere in the region of £50 to £75 per square metre. Smaller areas tend to sit at the top of that range because the fixed costs of materials, mixing equipment and labour are spread over fewer metres. Larger driveways of 80 square metres or more often come in at a better rate per metre.
If your driveway needs a new base as well, the total can rise to £100 to £140 per square metre once excavation, sub base and either a tarmac or concrete foundation are included. This is the figure that catches people out, so always check whether a quote includes groundwork or assumes your existing surface is usable.
- Small driveway around 40 square metres: roughly £2,000 to £3,000 for resin only
- Average driveway around 60 square metres: roughly £3,000 to £4,500 for resin only
- Full job with new base on an average driveway: often £6,000 to £9,000
What affects the price on Shrewsbury properties
The biggest single factor is the condition of what is already there. Resin bound surfacing needs a stable, crack free base, usually tarmac or concrete. Plenty of older properties around Shrewsbury, particularly in areas like Belle Vue, Castlefields and the villages out towards Bayston Hill and Bicton, still have original concrete or loose gravel drives that need replacing before resin can go down.
Access matters too. Terraced streets in the town centre with no off road parking make deliveries and mixing harder, which adds labour time. Sloped drives, common on the edges of the river loop, may need drainage planning, and complex shapes with curves, borders or multiple colours take longer to lay than a plain rectangle.
Do not forget drainage and permeability
Resin bound surfacing is permeable, meaning rainwater drains through it rather than running off. Laid over a permeable base, it normally complies with planning rules for front gardens without needing permission. Laid over existing concrete or tarmac, the surface itself still lets water through but the base underneath does not, so you may need channel drains or a soakaway to deal with runoff properly.
This matters in Shrewsbury more than most places. With the Severn prone to flooding and surface water a genuine local concern, it is worth asking any installer how they plan to handle drainage on your specific plot. A proper answer to that question is a good sign you are dealing with someone competent. Budget a few hundred pounds extra if channel drainage is needed.
How to compare quotes sensibly
A cheap quote usually means corners are being cut somewhere you cannot see. The common ones are laying resin too thin, using a non UV stable resin that yellows within a couple of years, or skipping base repairs. A resin bound driveway should be laid at a minimum depth of 15 to 18 millimetres for driveways taking car traffic, and the resin should be UV stable as standard.
Ask each installer to break their quote down: preparation and base work, edging, drainage, the resin and stone itself, and labour. Ask what depth they lay at, which resin system they use, and what their guarantee covers. Two quotes that look £1,500 apart can turn out to be for quite different jobs once you see the detail.
- Get the depth in writing, 15mm minimum for a driveway
- Confirm the resin is UV stable, not just UV resistant
- Check whether base preparation is included or extra
- Ask how long the written guarantee runs and what it excludes
Is it worth the money?
Compared with block paving, resin bound usually costs a similar amount or slightly less once you factor in that block paving needs more groundwork and regular re sanding. Compared with tarmac or gravel it is more expensive up front, but it does not shed stones, resists weeds, and needs little more than an occasional sweep and jet wash.
A properly installed resin bound driveway should last 15 to 25 years. Spread over that lifespan, the difference between a cheap job that fails in three years and a proper one is not large, and doing it twice is always the most expensive option.